Dry sites are not simply hot sites. They combine harsh water, temperature swings and occasional storms. The pillar page has the full site-conditions checklist; these are the conditions that dominate in arid districts.
Recycled, bore and pit water. Fit pre-filtration ahead of the injector's 200 mesh (80 micron) inlet filter wherever the water carries sand or grit. On a new installation, check filter loading daily until the cleaning interval is known. Test the surfactant in the water the site will actually use, not in potable water.
Salinity and hardness. Saline and hard water scale the injector and the nozzles. Descale the injector during scheduled service with Dosatron's 1:1 water and vinegar soak for 24 hours. Choose nozzle materials and free passage to suit the water. Check seal compatibility with the water and the additive together.
Heat by day, frost by night. Exposed desert pipe runs heat up in the sun. Keep the injector and the water reaching it below 104 °F with a shaded mount and buried or insulated supply. Many arid and high-altitude districts also freeze overnight. The frost protection or drain-down routine applies there as well.
Storms and runoff. Dry sites still get storm events, and storm runoff carries suppressant off roads and piles. Chlorides leach readily in rain (USDA Forest Service). Lignosulfonate is ruled out where runoff could reach fish-spawning waters (USDA NRCS). Check the drainage paths and the site permit before choosing a product.